High-performance PEB factory buildings designed for heavy load capacity, optimised production flow and structural durability — engineered for India's manufacturing growth.

A factory is only as productive as the envelope around it. Vastech engineers PEB factory buildings that match the rhythm of your manufacturing line — high clear height for overhead cranes, optimised bay spacing for material flow, roof systems engineered for ventilation, lighting and rooftop solar.
From food processing to heavy fabrication, we deliver factory structures that perform under continuous operational load — with insulation, fire-rated cladding and seismic resilience integrated from day one. Trusted by Mahindra, Honda, Toyota, JSW Steel, Britannia and ITC Limited.
Primary frames sized for EOT cranes up to 50T and dynamic equipment vibration.
Bay spacing and column layout optimised for line workflow and material handling.
Galvanised, painted or coated finishes engineered for 30+ year service life.
Insulated roof and wall panels for temperature-sensitive production.
EOT crane brackets and runway beams pre-engineered into primary frames.
Roof loading designed for future rooftop solar PV integration.
Our standard delivery cycle for factory buildings runs from concept through erection in 12-20 weeks depending on span, site access and statutory approvals. Every project is led by a single accountable engineer-in-charge — no handover gaps, no vendor finger-pointing.
We work to IS 800, IS 875, AISI and MBMA codes (IS 3177 / IS 807 for cranes), with seismic and wind analysis specific to your site. Quality is documented at every stage — material certificates, weld inspection reports, erection alignment audits — and handed to you as a permanent project record.