Warehouse Structures

Warehouses with more clear space and less waiting

Column-free logistics spaces with clear spans up to 60 m+, built for racking, docks and speed.

Warehouses with more clear space and less waiting
ISO 9001:2015certified1M+ sq ftdelivered4.9★Google rating
60 m+clear span delivered (Decathlon hub)
8 to 14 wkssmall to mid warehouse timeline
12 m+clear heights for high-bay racking
30+ yrsdesign life with low maintenance
Overview

Engineered for how you’ll actually use it.

In logistics, every column is a lost pallet position and every week of construction is lost rent. Vastech warehouses are designed for maximum clear span and clear height, with dock levellers, racking loads and future solar already in the drawings, delivered fast enough that small-to-mid warehouses typically go from contract to handover in 8 to 14 weeks.

Typical specification

Typical span30 to 60 m clear (multi-span for larger footprints)
Eave height8 to 14 m to suit racking
RoofStanding-seam / trapezoidal Galvalume, optional insulation
WallColour-coated sheet with brick dado option
DoorsRolling shutters, sectional doors, dock shelters
Floor coordinationFM2 / VNA flatness with civil partners

Every structure is designed for its site’s wind, seismic and load conditions to IS 800, IS 875 & IS 1893.

Capabilities

Engineering that comes built in.

Clear-span design

Wide, column-free bays that maximise racking density and forklift movement.

Dock-ready envelope

Dock canopies, leveller pits and rolling shutters planned from day one.

High-bay racking loads

Frames and floor coordination for selective, VNA and mezzanine racking systems.

Solar-ready roofs

Purlin spacing and roof loads designed to take rooftop solar later.

Cold-chain options

Insulated PUF panels and vapour barriers for temperature-controlled storage.

Monsoon-proof detailing

Generous gutters, sealed laps and slopes for Northeast rainfall intensity.

Warehouse Structures application
Applications

Industries we serve.

  • E-commerce fulfilment centres
  • 3PL & distribution hubs
  • Dark stores & quick commerce
  • Cold storage
  • FMCG & retail DCs
  • Agri & grain storage
Proof

Related projects.

All projects
Process

How we deliver.

Stage 1

Conceptual design

We study your site, loads, process and budget to define the right structural concept.

Stage 2

Drawing proposal

General arrangement drawings, design basis and a transparent BOQ-based proposal.

Stage 3

Contract sign-off

Clear scope, milestones and a single engineer-in-charge for your project.

Stage 4

Manufacturing

CNC cutting, welding and stage-wise QC at our Palwal factory.

Stage 5

Logistics

Sequenced dispatch of bolt-up kits to your site, anywhere in India, Bhutan or Nepal.

Stage 6

Erection

Certified crews erect, align, clad and hand over, with documentation.

FAQ

Warehouse Structures, FAQs.

What is the largest clear span you can build?
Single-span warehouses of 60 m are part of our delivered portfolio, and multi-span designs extend footprints almost without limit. The right span is the one that balances racking layout with steel weight.
How quickly can a warehouse be ready?
Small-to-mid warehouses typically take 8 to 14 weeks from contract sign-off, as fabrication at Palwal runs in parallel with foundation work at your site.
Is a PEB warehouse cheaper than RCC?
For large clear spans, PEB usually uses less material, builds much faster and starts earning rent sooner. Our cost guide on the blog explains a real 50,000 sq. ft. comparison.
Can you add rooftop solar later?
Yes, we recommend designing every new roof to be solar-ready, with purlin spacing and loads sized for panels, so you can add solar without strengthening work.
Get a quote

Planning warehouses? Let’s talk.

Free structural concept, indicative budget and timeline within one business day.

Other solutions

Request a warehouses quote

Four short steps, about 2 minutes. The more you share, the more accurate our proposal. Fields marked * are required.

Add-ons you need
Chat with an engineer
CallFree quote